![](https://collectifengineering.com/wp-content/uploads/2023/03/4.jpg)
![](https://collectifengineering.com/wp-content/uploads/2023/03/3.jpg)
![](https://collectifengineering.com/wp-content/uploads/2023/03/2.jpg)
![](https://collectifengineering.com/wp-content/uploads/2023/03/1.jpg)
450 W 31st Street 8th Floor | Corporate Fitout
Corporate
The COLLECTIF team led the MEP/FP systems for the fitout of the 8th floor (7,600 GSF) within an existing building in Manhattan. The new space houses three demised corporate offices.